Skip to content

Last Updated: 2026-05-03 Owner: Docs-Dev Summary: Structured task tracker template for managing QuantMatrix milestone work in a Notion-style board.

QuantMatrix Notion-Style Execution Tracker

This document is a structured execution tracker for QuantMatrix.

Its purpose is to convert the roadmap and design documents into a practical delivery board that can be used in a Notion-style workflow.

Use this as: - a milestone tracker - a module tracker - a dependency tracker - a release readiness tracker - a build status dashboard

Current ownership convention: - UI tasks: UI-Dev - API tasks: API-Dev - backend process and service tasks: Process-Dev - testing and validation tasks: QA-Dev - data and schema tasks: Data-Dev - operations and deployment tasks: Ops-Dev - documentation and coordination tasks: Docs-Dev - strategy logic tasks: Strategy-Dev - risk enforcement tasks: Risk-Dev

1. How To Use This Tracker

Each task should have: - a clear owner - a status - a milestone - dependencies - acceptance criteria - links to relevant documents

Recommended status values: - Not Started - Ready - In Progress - Blocked - In Review - Done - Deferred

Recommended priority values: - P0 - P1 - P2 - P3

Recommended workstream values: - Platform - Trading Core - Strategy - Risk - UI - Analytics - Operations - Release

2. Master Milestone Tracker

Milestone Goal Status Owner Depends On Exit Criteria
M1 Foundation and Core Runtime Establish config, infra, health, schemas, and runtime skeleton Not Started Process-Dev Local runtime boots cleanly
M2 Local Demo Trading Platform Deliver safe local end-to-end demo experience Not Started UI-Dev / Process-Dev M1 Demo UI and dry-run trading work
M3 Paper Trading Core Connect real paper broker flows and reconciliation Not Started API-Dev / Process-Dev M1, M2 Orders, positions, and account summary reconcile
M4 Strategy and Risk Maturity Enable automated scanning, strategy flow, and risk enforcement Not Started Strategy-Dev / Risk-Dev / Process-Dev M3 Entries flow through scanner, allocator, risk, and OMS
M5 Trade Analytics and Review Capture and explain full trade lifecycle Not Started Data-Dev / API-Dev M3, M4 Completed trades are analytically reviewable
M6 Operational Hardening Make the system safe to operate under stress Not Started Ops-Dev / Process-Dev M3, M4, M5 Recovery and incident paths are rehearsed
M7 Limited Live Rollout Launch with restricted real capital and close supervision Not Started Ops-Dev / API-Dev M6 First live session completes safely
M8 Production Expansion Broaden capability after stable live operation Not Started Strategy-Dev / UI-Dev / Process-Dev M7 New features expand safely without weakening controls

3. Milestone Work Breakdown

M1 Foundation and Core Runtime

Task ID Task Workstream Priority Status Owner Depends On Acceptance Criteria
M1-01 Define repo structure Platform P0 Not Started Process-Dev Directories and ownership boundaries documented
M1-02 Implement config loader Platform P0 Not Started Process-Dev Environment-specific config loads safely
M1-03 Implement structured logging Platform P0 Not Started Process-Dev Logs include service, timestamp, severity, correlation fields
M1-04 Implement health framework Platform P0 Not Started API-Dev Health endpoint reports dependency status
M1-05 Wire Redis connection layer Platform P0 Not Started Process-Dev Redis connectivity validated
M1-06 Wire PostgreSQL connection layer Platform P0 Not Started Data-Dev DB connectivity validated
M1-07 Add migration workflow Platform P0 Not Started Data-Dev M1-06 Migrations run repeatably
M1-08 Create shared domain models Platform P1 Not Started API-Dev M1-02 Shared schemas usable by downstream modules
M1-09 Create broker abstraction base Trading Core P0 Not Started Process-Dev M1-08 Broker interface stable enough for adapters
M1-10 Create market data abstraction base Trading Core P0 Not Started Process-Dev M1-08 Provider interface stable enough for adapters

M2 Local Demo Trading Platform

Task ID Task Workstream Priority Status Owner Depends On Acceptance Criteria
M2-01 Implement dry-run broker Trading Core P0 Not Started Process-Dev M1-09 Local order simulation works
M2-02 Implement demo market data feed Trading Core P0 Not Started Process-Dev M1-10 Demo data streams into UI path
M2-03 Build Command Center UI shell UI P0 Not Started UI-Dev M1-01 Main dashboard renders
M2-04 Build Account screen UI P1 Not Started UI-Dev M2-03 Account view loads with demo data
M2-05 Build Orders and Positions screens UI P1 Not Started UI-Dev M2-03 Screens render and update correctly
M2-06 Build Settings screen UI P1 Not Started UI-Dev M2-03 Runtime settings visible
M2-07 Connect demo actions end to end Trading Core P0 Not Started API-Dev M2-01, M2-02, M2-03 Demo watchlist/orders/positions flow works

M3 Paper Trading Core

Task ID Task Workstream Priority Status Owner Depends On Acceptance Criteria
M3-01 Implement paper broker adapter Trading Core P0 Not Started Process-Dev M1-09 Paper account connects cleanly
M3-02 Fetch account summary from broker Trading Core P0 Not Started API-Dev M3-01 UI values match broker account
M3-03 Implement order placement/cancel path Trading Core P0 Not Started API-Dev M3-01 Paper orders submit and cancel correctly
M3-04 Implement order lifecycle persistence Trading Core P0 Not Started Data-Dev M1-06, M1-07, M3-03 Orders persist with correct states
M3-05 Implement position synchronization Trading Core P0 Not Started Process-Dev M3-01 Internal positions match broker
M3-06 Implement startup reconciliation Operations P0 Not Started Ops-Dev M3-04, M3-05 Startup resolves state safely
M3-07 Implement end-of-session reconciliation Operations P1 Not Started Ops-Dev M3-04, M3-05 Daily close reconciles orders and positions

M4 Strategy and Risk Maturity

Task ID Task Workstream Priority Status Owner Depends On Acceptance Criteria
M4-01 Build Momentum Radar service Strategy P0 Not Started Process-Dev M1-10, M1-05 Radar fetches and normalizes top gainers
M4-02 Build Redis snapshot store Strategy P0 Not Started Data-Dev M4-01 1-min and 5-min changes derive from cached snapshots
M4-03 Build Opportunity Scanner Strategy P0 Not Started Strategy-Dev M4-01, M4-02 Eligible names move into watchlist candidates
M4-04 Build Active Strategy Watchlist lifecycle Strategy P0 Not Started Process-Dev M4-03 Waiting/Active/Hold/Closed states work
M4-05 Build Strategy Allocator Strategy P0 Not Started Strategy-Dev M4-04 Active slot and rotation rules enforced
M4-06 Build entry strategy interface and first strategy Strategy P0 Not Started Strategy-Dev M4-05 Entry signals generated through interface
M4-07 Build exit strategy interface and first exit logic Strategy P0 Not Started Strategy-Dev M3-05, M4-06 Filled positions hand off to exit management
M4-08 Build Global Risk Manager Risk P0 Not Started Risk-Dev M3-03, M4-06 Orders blocked on risk violations
M4-09 Enforce one-buy-per-symbol and idempotency rules Risk P0 Not Started Risk-Dev M4-06, M4-08 Duplicate orders prevented

M5 Trade Analytics and Review

Task ID Task Workstream Priority Status Owner Depends On Acceptance Criteria
M5-01 Create trades and trade_events schema Analytics P0 Not Started Data-Dev M1-06, M1-07, M3-04 Trade lifecycle persistence exists
M5-02 Capture entry and exit context Analytics P0 Not Started Data-Dev M4-06, M4-07 Strategy reasons and timestamps are stored
M5-03 Capture indicator values and trade features Analytics P0 Not Started Data-Dev M4-01, M4-06, M4-07 Key features stored at entry and exit
M5-04 Compute MFE/MAE and outcome labels Analytics P1 Not Started Data-Dev M5-03 Trade outcomes are analyzable
M5-05 Build recommendation generation workflow Analytics P1 Not Started API-Dev M5-04 Recommendations are auditable and versioned
M5-06 Create trade review reporting path Analytics P1 Not Started API-Dev M5-01 to M5-05 Daily review can summarize winners/losers

M6 Operational Hardening

Task ID Task Workstream Priority Status Owner Depends On Acceptance Criteria
M6-01 Implement emergency liquidate and halt Operations P0 Not Started Ops-Dev M3-03, M4-08 System can halt and liquidate safely
M6-02 Improve health and alerting coverage Operations P0 Not Started Ops-Dev M3-01, M4-08 Critical failures are visible quickly
M6-03 Implement crash recovery and replay logic Operations P0 Not Started Process-Dev M3-06, M5-01 Recovery restores safe state
M6-04 Rehearse broker outage scenarios Operations P1 Not Started QA-Dev M6-01, M6-02 Team can follow incident path confidently
M6-05 Align system behavior with runbooks Operations P1 Not Started Docs-Dev M6-01 to M6-04 Docs and runtime match

M7 Limited Live Rollout

Task ID Task Workstream Priority Status Owner Depends On Acceptance Criteria
M7-01 Configure live broker environment safely Release P0 Not Started Ops-Dev M6-05 Live environment is separated and reviewed
M7-02 Validate live account summary and connectivity Release P0 Not Started QA-Dev M7-01 Live account connects safely
M7-03 Run live go-live review Release P0 Not Started QA-Dev M7-01, M7-02 Go/no-go decision documented
M7-04 Execute limited-capital first live session Release P0 Not Started Ops-Dev M7-03 Session completes safely
M7-05 Complete first-week live monitoring review Release P1 Not Started QA-Dev M7-04 Stability evidence collected

M8 Production Expansion

Task ID Task Workstream Priority Status Owner Depends On Acceptance Criteria
M8-01 Add second strategy family Strategy P1 Not Started Strategy-Dev M7-05 New strategy runs without weakening controls
M8-02 Add richer analytics screens Analytics P1 Not Started UI-Dev M5-06, M7-05 Trade insights are easier to consume
M8-03 Add second broker adapter Trading Core P2 Not Started Process-Dev M7-05 Broker abstraction holds under new adapter
M8-04 Improve release automation and deployment tooling Release P2 Not Started Ops-Dev M6-05 Deployments become more repeatable

4. Cross-Cutting Must-Have Tasks

These tasks should not be forgotten while building milestone features.

Task ID Task Workstream Priority Status When To Check
X-01 Structured logging coverage Platform P0 Not Started Process-Dev
X-02 Health checks and metrics coverage Operations P0 Not Started Ops-Dev
X-03 Test coverage updates Platform P0 Not Started QA-Dev
X-04 Runbook and checklist updates Operations P1 Not Started Docs-Dev
X-05 UI clarity and operator safety review UI P1 Not Started QA-Dev
X-06 Analytics capture integrity review Analytics P1 Not Started QA-Dev

5. Suggested Notion Database Properties

If you move this into Notion, use these properties:

Task Database Properties

  • Task ID
  • Task Name
  • Milestone
  • Workstream
  • Priority
  • Status
  • Owner
  • Depends On
  • Start Date
  • Target Date
  • Acceptance Criteria
  • Risk Notes
  • Linked Doc

Milestone Database Properties

  • Milestone
  • Goal
  • Status
  • Owner
  • Start Date
  • Target Date
  • Blocked By
  • Exit Criteria
  • Notes

6. Weekly Review Template

Use this each week:

Progress

  • What moved to Done?
  • What moved to In Progress?
  • What got blocked?

Risks

  • What new risk appeared?
  • What existing risk got worse?

Decisions

  • What should be deferred?
  • What should be accelerated?
  • What needs clarification from design docs?

Next Week Focus

  • Top 3 milestone tasks:
  • Top 3 blocker removals:

7. Definition of Ready for a Task

A task is ready to start when: - scope is clear - dependency tasks are complete - acceptance criteria are written - owner is assigned - relevant document links are known

8. Definition of Done for a Task

A task is done only when: - implementation is complete - tests pass - logs/health/metrics are adequate if relevant - docs are updated if behavior changed - acceptance criteria are met - downstream impact has been checked

The next best artifact after this tracker is either: - a Data Dictionary / Schema Reference, if you want stronger precision around entities and fields, or - a Milestone Sprint Plan, if you want to schedule the first 2-4 weeks in detail.